SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT GAS TREATMENT UNIT (EPC2- PHASE1)

Dec.2019 To May. 2021

Client & Contractor:

L&T Hydrocarbon Engineering (LTHE).

Works Description:

  • Construction of the civil work for CPF
  • Include the following activities:
  • Earth Work
  • Concrete Work
  • Coating
  • Grouting
  • Road and Paving
  • Fence Work

Provision of Mechanical, Electrical & Instrumentation Construction Works

Dec.2019 To Jul. 2020

Client & Contractor:

In Salah Gas (ISG) / CTCO.

Works Description:

  • Construction of DSS Flow lines including civil works
  • Construction of Electrical and Instrumentation works
  • General maintenance works
  • Supply and construction of E& I works as required
  • Modification of existing facilities
  • Advanced Security enhancement works

PROVISION OF SURFACE FACILITY EPC SERVICES PHASE-4 DEVELOPMENT

Sep. 2019 – Mar. 2020

Provision Of Surface Facility Epc Services Phase-4 Development

Client & Contractor:

PERTAMINA, EPPM SA.

Works Description:

Construction of the Civil activities for the platform of Three Wells Pads:

MLNW 11P, KM06 GI and KM07 GI at MLN.

Extension of Base de VIE at Hassi Messaoud

Jun-2018 to Jun-2020

Extension of Base de VIE at Hassi Messaoud

Client & Contractor:

PERTAMINA / HOURSALEM / CTCO

Works Description:

  • Construction of Administration Building 2 Floors (846m2)
  • Construction of Laundry, Maintenance Garage and Storage Rooms (194m2)
  • Construction of Studios for Personal: 16 Senior Rooms (420m2) + 2 VIP Rooms (105m2)
  • Construction of External Works and Facilities (4873m2).
  • Construction of Law Voltage Works.

EXECUTION OF SEPARATION AND COMPRESSOR CENTRE (CSC) - SOUTH HGA

Aug. 2019 – Sep. 2020

Client & Contractor:

Sonatrach & Dodsal Engineering and Construction Ltd.

Works Description:

Construction of 138 Km pipeline
Ø 20’’ , L = 27,951 m  Ø 18’’ , L = 8,604 m
Ø 16’’, L = 31,613 m  Ø 10’’, L = 8,638 m
Ø 8’’  , L = 29,369 m  Ø 6’’  , L = 32,407 m
The activities are included all the following: Civil, Mechanical Welding, CP, and FOC.

Construction of IT Building at BDV - MLN

Mar-2019 to Feb-2020

Construction of IT Building at BDV - MLN

Client & Contractor:

PERTAMINA / HOURSALEM / CTCO

Works Description:

Construction of Informatique Building of Base De Vie – MLN.

OLEODUC G3 & G4 Ø 24’’ – 76 Km - TUNIS

Feb.2016 To Jul 2017

OLEODUC G3 & G4 Ø 24’’ – 76 Km - TUNIS

Client & Contractor:

la Société Tunisienne d’Electricité et du Gaz (S.T.E.G.) / C.T.C.O. / RETEL

Works Description:

The supply of all equipment and execution of installation and services required for the construction work, testing and pipeline commissioning. TUNIS pipeline start-Mornaguia-MABTOUH and his works.

Provision of Mechanical, Electrical & Instrumentation Construction Works

Dec.2015 To Nov. 2019

Client & Contractor:

In Salah Gas (ISG) / CTCO.

Works Description:

  • Construction of DSS Flow lines including civil works
  • Construction of Electrical and Instrumentation works
  • General maintenance works
  • Supply and construction of E& I works as required
  • Modification of existing facilities
  • Advanced Security enhancement works

Construction of Underground 8ӯ Duplex flow line for KB-17 well at KBA

Sep-2009 to Dec- 2009

Construction of Underground 8ӯ Duplex flow line for KB-17 well at KBA

Client & Contractor:

In Salah Gas / CTCO.

Works Description:

Trenching, Transportation, Laying, Field Weld, NDT & Coating, Lowering, Backfilling, Testing & Commissioning of 8ӯ Duplex flow line from Main header to KB-17 well

Construction of TEG Header and Gathering system flow lines

Dec-2009 to Nov- 2013

Construction of TEG Header and Gathering system flow lines

Client & Contractor:

In Salah Gas / CTCO.

Works Description:

Trenching, Transportation, Laying, Field Weld, NDT & Coating, Lowering, CP. Fiber Optic Cable Installation, Backfilling, Testing & Commissioning of 12”Ø Duplex flow line Header & 6”, 8” Ø Duplex Flow Lines to various wells (40 K.M Approx).

Construction of Well pads and Access Roads at KBA,TEG & REG ‐ Algeria

Nov-2010 to Oct - 2013

Client & Contractor:

BP SONATRACH and STATOIL JV & CTCO.

Works Description:

Material Procurement, Fabrication and Construction of Gas Well Heads and Miscellaneous works such as construction of Personnel camps, Offices, , Roads and Airport gypsum runways.

Algiers Refinery Rehabilitation and Adaptation Pipeline Works.

Dec-2011 to Nov- 2012

Algiers Refinery Rehabilitation and Adaptation Pipeline Works.

Client & Contractor:

SONATRACH , TECHNIP & CTCO.

Works Description:

Construction of 5 underground Pipelines Ø 26”,  16”,  10” and 6”. Trenching, Laying, Welding, NTD, Coating, Backfilling, Testing and Tie-In.

Pose d’un Réseau Injection de Gaz sur le champ de HMD

Feb-2012 to Dec- 2015

Pose d’un Réseau Injection de Gaz sur le champ de HMD

Client & Contractor:

SONATRACH & CTCO.

Works Description:

Construction of heavy wall Flow lines, 12”,  10” and 6” (32km length), the fabrication and installation of Manifolds. Trenching, Laying, Welding, NTD, Coating, Backfilling, Testing and Tie-In.

Construction of General Civil Work KBA,TEG , REG & HMN ‐ Algeria

Nov-2013 to Dec- 2014

Construction of General Civil Work KBA,TEG , REG & HMN ‐ Algeria

Client & Contractor:

BONATTI EURL.

Works Description:

Material Procurement, Fabrication and Construction of Gas Well Heads and Miscellaneous works such as construction of Personnel camps, Offices, , Roads and Airport gypsum runways.

Construction of Well pads and Access Roads at HMN

Nov-2014 to Aug-2017

Construction of Well pads and Access Roads at HMN

Client & Contractor:

PETROFAC & CTCO.

Works Description:

Construction of 20 Gas Well Heads:

  • Platform earth work, cutting & filling.
  • Concrete Works.
  • Access Roads.
  • Liners.
  • Drain Channels.
  • Fencing & Gates

CONSTRUCTION OF 24 APERTMENTS AT BLIDA

Aug-2014 to Apr-2016

Client & Contractor:

DAR ALBARAKA & {MIRI CO. and CTCO}

Works Description:

Residential buildings consist of 2 buildings, the first one is 9 floors with an area = 460 m2, the second one is 6 floors with an area = 320 m2.

Construction of 36 Apartments and a Bank branch at CHERAGA, ALGER

Dec. 2014 to Dec 2018

Construction of 36 Apartments and a Bank branch at CHERAGA, ALGER

Client & Contractor:

DAR ALBARAKA & {MIRI CO. and CTCO}

Works Description:

Bank branch (area = 335 m2), Residential building of four floors and consist of three blocks  Block A = 360 m2, Block B = 382 m2, and Block C = 497 m2.

Civil Works for KRECHBA CPF Expansion - Algeria

Feb-2008 - Jun-2010

Civil Works for KRECHBA CPF Expansion - Algeria

Client & Contractor:

BP, SONATRACH and STATOIL – JV  & PETROFAC / CTCO as a subcontractor.

Works Description:

Material Procurement & Construction of Civil works for KRECHBA CPF Expansion works at In SALAH Gas Field.

IN SALAH GAS - HMD-BDV Expansion - Algeria

Dec-2008 - Dec-2009

IN SALAH GAS - HMD-BDV Expansion - Algeria

Client & Contractor:

BP, SONATRACH and STATOIL – JV  & CTCO.

Works Description:

Material Procurement, Fabrication and Construction of Gas Well Heads and Miscellaneous works such as construction of Personnel camps, Offices, Roads and Airport runways.

Construction of Access Roads & Well pads - Algeria

2007 - 2010

Construction of Access Roads & Well pads - Algeria

Client & Contractor:

BP, SONATRACH and STATOIL – JV  & CTCO.

Works Description:

Material Procurement, Fabrication and Construction of Gas Well Heads and Allied camps.

Construction of Access Roads, Well Heads & Camps for Personnel - Algeria

2006 / 2007

Construction of Access Roads, Well Heads & Camps for Personnel - Algeria

Client & Contractor:

BP, SONATRACH and STATOIL – JV  & Brown And Root Condor (BRC) / CTCO as a subcontractor.

Works Description:

Material Procurement, Fabrication and Construction of Gas Well Heads and Allied camps.